Friday, August 28, 2009

Inside Photos










A couple of photos from inside the house. One of the Pex plumbing hub - I'm sure the plumbers love running this tubing rather than copper. Next picture is from the garage door looking toward the door into the house. You can see that some of the dry wall is up and the foam insulation in the ceiling. Final photo is the looking at the insulation in the dining room. You can see the part of the window as well.

The dry wall is almost completely done, and they're working on the stucco as well. Next step is the wall textures and cabinetry.

Friday, August 14, 2009

Back of House - Porch

Top photo is a view of the back of the house. The guest bedroom is the window on the left and the rest is the back porch. The bottom photo shows the back porch.

Weatherproof Structure

View of the front shows the roof is now done and the elevation has shown its face. Hard to believe, but we actually got delayed by a few heavy showers (after a month + of drought). Getting the roof on gives the green light to the electrical, plumbing and other interior construction. The windows are also installed, so it's a virtual heat box.