Saturday, July 18, 2009

Starting To Take Shape

Once the slab was poured, the structure went up so fast. In this picture, the 1st floor framing is done and the 2nd floor is getting started. The garage is on the right and the front door is directly behind the sign.

No comments:

Post a Comment